| Search results |
| Previous page | New search |
| Search: pe=Zimbabwe Engineer | ||||||||
| Found: 109 | Record 101-109 | |||||||
![]() | Mabena, A. (1992) |
| National railways, infrastructure development or neglect | |
| Zimbabwe Engineer. Volume 57 #7. July. p. 17, 19, 21. |
![]() | (1992) |
| Rehabilitation of Mozambican railway lines | |
| Zimbabwe Engineer. Volume 57 #7. July. p. 5-11, 13-15. |
![]() | Zhuwakinyu, M. (1992) |
| Zimbabwe's steel industry has remained stagnant | |
| Zimbabwe Engineer. Volume 57 #6. June. p. 15, 17. |
![]() | Pattison, J. (1992) |
| Reliability engineering and the rolling bearing | |
| Zimbabwe Engineer. Volume 57 #5. May. p. 6-7, 8-10. |
![]() | (1992) |
| Electricity crisis in Zimbabwe | |
| Zimbabwe Engineer. Volume 57 #4. April. p. 5-6. |
![]() | Collier, M. (1992) |
| Importance of software engineering in Zimbabwean engineering context | |
| Zimbabwe Engineer. Volume 57 #3. March. p. 9-11, 13, 15-16. |
![]() | (1992) |
| Study on Zambezi water scheme | |
| Zimbabwe Engineer. Volume 57 #3. March. p. 5, 7-8. |
![]() | Reimer, L. (1992) |
| Women in engineering in Zimbabwe | |
| Zimbabwe Engineer. Volume 57 #2. February. p. 17-19. |
![]() | Mpala, A.S. (1992) |
| The Batoka hydroelectric scheme | |
| Zimbabwe Engineer. Volume 57 #1. January. p. 9, 11, 13, 15. |
| Search: pe=Zimbabwe Engineer | ||||||||
| Found: 109 | Record 101-109 | |||||||
| Previous page | New search |