| Search results |
| Previous page | New search |
| Search: su=Engineering design | ||||||||
| Found: 22 | Record 1-22 | |||||||
![]() | (1999) |
| Mwalimu Julius K. Nyerere pension tower | |
| Construction Review (Nairobi, Kenya). Volume 10 #4. April. p. 52-55. |
![]() | (1999) |
| St. Austin's gardens apartment in Lavington: setting standards of residential developments in the region | |
| Construction Review (Nairobi, Kenya). Volume 10 #8. October. p. 28-31. |
![]() | Svotwa, R.S. (1999) |
| The design and acquisition strategies of engineering safety | |
| On Guard (Harare, Zimbabwe). Volume 6 #16. March. p. 18-24. |
![]() | (1998) |
| Trust tower: the king of Upper Hill | |
| Construction Review (Nairobi, Kenya). Volume 9 #10. October. p. 35-38. |
![]() | Kimathi, J. (1998) |
| City architecture and bomb explosion disaster | |
| Construction Review (Nairobi, Kenya). Volume 9 #9. September. p. 8-10. |
![]() | Kimathi, J. (1998) |
| Critical features on tall buildings | |
| Construction Review (Nairobi, Kenya). Volume 9 #10. October. p. 13-14. |
![]() | Kitololo, A.S. (1998) |
| El Nino effects and infrastructural decadence | |
| Construction Review (Nairobi, Kenya). Volume 9 #6. June. p. 18-19. |
![]() | Ndirangu, W. (1998) |
| Designing a compact water treatment plant | |
| Construction Review (Nairobi, Kenya). Volume 9 #8. August. p. 16, 18. |
![]() | (1997) |
| Investments & Mortgages Building, Ngong Road, Nairobi | |
| Construction Review (Nairobi, Kenya). Volume 8 #9. September-October. p. 35-36. |
![]() | Gilbu, A. (1997) |
| The north-south carrier water project: Botswana's master plan | |
| Construction Review (Nairobi, Kenya). Volume 8 #10. October-November. p. 21-25, 52. |
![]() | Zhuwakinya, M. (1997) |
| Eastgate building: the largest commercial building in Zimbabwe | |
| Construction Review (Nairobi, Kenya). Volume 8 #2. February-March. p. 18. |
![]() | Blumeris, P. (1993) |
| Peak design flows in water distribution systems | |
| Zimbabwe Engineer. Volume 58 #7. October-November. p. 10-11, 13-15. |
![]() | Jones, D. (1992) |
| Hospital services design | |
| Zimbabwe Engineer. Volume 57 #10. October. p. 7-9. |
![]() | Wilmshurst, T. (1992) |
| Some examples of instrumentation in geotechnical centrifuges | |
| Botswana Journal of Technology. #1. February. p. 3-11. |
![]() | Adebayo, Yinka R. (1991) |
| The Climatology of Engineering Design in Nairobi | |
| Eastern and Southern Africa Geographical Journal. Volume 2 #1. April. p. 57-66. |
![]() | Mackechnie, W.R. (1991) |
| Geotechnical aspects of road pavement design: a 1991 review of current practice in Zimbabwe | |
| Mining and Engineering. Volume 56 #9. September. p. 11, 13, 15. |
![]() | Matthews, A.J.D. (1991) |
| Cost savings in the design and construction of roads in Zimbabwe | |
| Mining and Engineering. Volume 56 #9. September. p. 15, 17, 19, 21, 23. |
![]() | Patel, I.B. (1991) |
| The unusual structural design and construction problems at Lonrho House | |
| Kenya Engineer. Volume 12 #2. March-April. p. 31-34. |
![]() | Stephens, R.; Musarurwa, B. (1991) |
| Practical road rehabilitation and design, an approach for SADCC | |
| Mining and Engineering. Volume 56 #10. October. p. 31, 33-35. |
![]() | Kuzviwanza, M. (1990) |
| The NRZ diesel locomotive refurbishment, an appraisal. Pt.1 | |
| Railroader. Volume 7 #6. June. p. 21, 25-26, 28. |
![]() | Kuzviwanza, M. (1990) |
| The NRZ diesel locomotive refurbishment. Pt.2 | |
| Railroader. Volume 7 #7. July. p. 21, 23-24, 26-27. |
![]() | Mpawenayo, P.; Rwanzegushira, J. (1987) |
| Analyse des paramétres physiques régissant les transferts de chaleur dans un cuisson sur un braséro | |
| Etudes rwandaises. Volume 1 #3. avril-juin. p. 382-395. |
| Search: su=Engineering design | ||||||||
| Found: 22 | Record 1-22 | |||||||
| Previous page | New search |