Search results |
Previous page | New search |
Search: su=Hydroelectric power | ||||||||
Found: 25 | Record 1-25 |
Hankins, M. (2003) | |
Power struggle | |
Ecoforum. Volume 26 #2. long rains. p. 46-48. |
Hankins, M. (2002) | |
Rethinking mega power | |
Ecoforum. Volume 25 #3. hot season. p. 39-42. |
Anonymous (2001) | |
Providing power for Kenya's needs | |
Kenya Engineer. Volume 22 #1. January-February. p. 18-19. |
Collins, Robert O. (2001) | |
Uganda, Egypt, and the Owen Falls Dam | |
Uganda Journal. Volume 47. November. p. 1-9. |
Muramira, T.E. (2001) | |
Valuing the losses caused to Mabira Forest by hydropower development in Uganda | |
Innovation (Nairobi, Kenya). Volume 8 #2. July. p. 28-30. |
Atenyo, J.N. (2000) | |
Sondu-Miriu: at whose cost? | |
EcoNews Africa. November. p. 4-7. |
Gichuki, J. (2000) | |
Is there a way out | |
Executive (Nairobi, Kenya). June-July. p. 18-21. |
Cooksey, B. (1998) | |
A very expensive affair: private electricity project bodes ill for Tanzania's transition to market economy | |
East African Alternatives. September-October. p. 20-22. |
Anonymous (1995) | |
Rural electrification: power firm spreads out wings | |
Jua Kali News. Volume 2. May-June. p. 19-22. |
Musyoka wa Kyendo. (1995) | |
Privatisation: energy next | |
Option (Nairobi, Kenya). #2. March. p. 28-29. |
Mwangi, W. (1995) | |
Countdown begins on Kenyan's next dam | |
EcoNews Africa. Volume 4 #6. 23 Mar.. p. 1, 7. |
Sitoe, J. (1995) | |
Barragem de Massingir: o 'gigante' será salvo das infiltraçoes | |
Tempo. #1288. 27 de agosto. p. 4-8. |
Dale, A.P. (1993) | |
The drought and its effect on the hydro-electric generating capacity of Zambia and Zimbabwe | |
SADCC Energy. Volume 10 #27. May-June-July. p. 41-52. |
Salgueiro, J.; Ellefsen, T. (1993) | |
The drought: consequences for the power generation | |
SADCC Energy. Volume 10 #26. January-February-Mar.. p. 3-5. |
Titos, A. (1993) | |
Hidroeléctrica de Cahora Bassa: potência subaproveitada | |
Tempo. #1181. 11 de julho. p. 18-23. |
Dale, P. (1992) | |
Electricity shortage in the context of regional cooperation | |
Zimbabwe Engineer. Volume 57 #11. November. p. 11, 13, 15. |
Johnson, J. (1992) | |
Lesotho Highlands Water Project | |
Molepe. Volume 6 #28. March-April. p. 20-31. |
Jordanger, E. (1992) | |
Power cooperation in the Southern African region | |
SADCC Energy. Volume 9 #24. January-February-Mar.. p. 11-17. |
Messerschmidt, L.J. (1992) | |
Energy and water, a regional perspective | |
Zimbabwe Engineer. Volume 57 #11. November. p. 8-9, 11. |
Mpala, A.S. (1992) | |
The Batoka hydroelectric scheme | |
Zimbabwe Engineer. Volume 57 #1. January. p. 9, 11, 13, 15. |
Nogueira, T. (1992) | |
Uma viagem ao 'interior' de Maputo. Pt.5, Barragem dos Pequenos Libombos entra na segunda fase | |
Tempo. #1115. 1 de março. p. 24-27. |
Wolde-Ghiorgis, W. (1992) | |
On a tandem small-scale wind and micro hydropower energy conversion model | |
Sinet. Volume 15 #1. June. p. 1-21. |
Vanebo, T. (1989) | |
New projects identified for Zambia/Malawi/Tanzania power sharing | |
SADCC Energy. Volume 7 #19. p. 17-18. |
Dos Santos, A. (1988) | |
Brazil/SADCC cooperation: you can see light at the end of the tunnel | |
SADCC Energy. Volume 6 #17. p. 21-22. |
Ystgaard, O. (1988) | |
An overview of the Norwegian energy sector | |
SADCC Energy. Volume 6 #18. p. 30-33. |
Search: su=Hydroelectric power | ||||||||
Found: 25 | Record 1-25 |
Previous page | New search |